Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Mutiara Etnik Sdn Bhd | Cenviro Recycling & Recovery Sdn Bhd | 2024 | OPAL & MAVROS | Piping Fabrication & Installation Works |
RP Chemical (M) Sdn Bhd | RP Chemical (M) Sdn Bhd | 2025 | RPCM TAR February 2025 | RPCM TAR February 2025 |
Sankyu (M) Sdn
Bhd | Idemitsu SM (M)
Sdn Bhd | Since 1998 | Manpower
Supply at
Idemitsu, Pasir
Gudang | In Works |
Working Experience - Project
Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Toyo Engineering & Construction SB | EastmanChemical (M)Sdn Bhd | 2021 | K2C Scalper and Reblending Project | -Supply and Installation Works for K2C Scalper and
- Reblending Project Erection Works |
Toyo Engineering & Construction SB | EastmanChemical (M)Sdn Bhd
| 2021 | EKM Synergy Project | -Supply and Installation Works for EKM
-Synergy Project Erection Works |
Principle
Perspective
Engineering Sdn Bhd | Kellogg Asia
Products
| 2021 | Waste Water Pipe
Replacement | Supply, delivery and install waste water pipe
replacement using material SS304
|
China Railway 17th
Bureau Group (M)
S B
| Prasarana Malaysia Berhad | 2021 | LRT3 Drainage Works | Construction and Completion of Guideway,
Stations , Ancillary Buildings and Other Associated
Works for package GS06 for Light Rail Trans it Line 3
(LRT3) From Bandar Utama to Johan Setia
- Drainage Works
|
Toyo Engineering & Construction SB | Petronas Carigali
Sdn Bhd | 2019 | Firewater Line Works (KSL-GMC J V) | Underground & Above ground Fire Wire Water Line
Ductile Iron Pipe |
TTCL (M) Sdn Bhd | Petronas Berhad | 2019 | RAPID SCC Project(KSL-GMC J V) | Civil work for tank farm 5210-T-105 A/B, HDP E
Lining, Earthwork, Civil work and Misc. works . |
Petrofac E&C Sdn.Bhd. | Petronas Berhad | 2019 | RAPID Package 4 (KSL-GMC J V) | work, foundation work & other infrastructure work).
|
Shinryo (Malaysia)Sdn Bhd | Petronas Gas Berhad Malaysia | 2019 | Utilities Gebeng Cogeneration Expansion (UGCE) Project | Engineering, Procurement, Construction and
Commissioning for Utilities Gebeng (UG)
Cogeneration Expansion at Gebeng, Pahang |
China Eleventh
Chemical
Construction Co .Ltd. | Petronas Berhad | 2019 | Utilities Interco nnecting &
Offs ite RAP ID P ackage
14
| Manpower supply for Scaffolding Works . |
Samsung
Engineering (M) Sdn
Bhd | Petronas Carigali Sdn Bhd | 2019 | RAPID Package 11 (KSL-GMC J V) | Manpower Supply for Piping Work |
Toyo Engineering & Construction SB | Petronas Berhad | 2019 | RAPID Refinery & Cracker, Project. (KSL-GMC J V) | Manpower Supply for Piping Erection |
TTCL Malaysia Sdn Bhd | Petronas Berhad | 2019 | RAPID SCC ProjectTXYA109 (KSL-GMC J V) | 2 Bas ins and trench work (including earthwork, civil |
Working Experience-Shutdown & Maintenance
Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Cabot (M) Sdn Bhd | Cabot (M) Sdn Bhd | 2013 | Maintenance | Installation for New Cooling Tower piping |
FPG Oleo chemicals Sdn Bhd | FPG Oleo chemicals Sdn Bhd | 2013 | Maintenance | Supply of labour , tools & transportation to execute
mechanical works .
|
FPG Oleo chemicals Sdn Bhd | FPG Oleo chemicals Sdn Bhd | 2013 | Major Shutdown | Provide manpower to as s is t maintenance day to
day operations job. |
Petron (M)
Refining &
Marketing Bhd | Petron (M)
Refining &
Marketing Bhd | 2013 | Maintenance &
Repair | Provide CW Line to OSP -64 A/B
Repair E1089 Channel Head Leaking and Additional
Replace Tiles with anti-Slip Tiles C-2/3
Remove Hyacinth and remove Overgrown
Repair Jetty P LR Cover Warning Device
Greasing work for floating Ro o f Ladder and
Housekeeping at Ro o f Deck
Carry out OIR-12-055 as per Inspection &
Scaffolding Works |
Pahlawan Power Sdn Bhd | Pahlawan Power Sdn Bhd | 2012 | Shutdown | Hydrostatictesting for HRSG 1 & 2 including
required inspection works . |
Dialog Plant
Services Sdn Bhd | Petronas Penapisan Melaka | 2011 | Turnaround | Mechanical and defect package fo r P SR-2
package A.
|
PFC Engineering Sdn Bhd | Petronas Penapisan Melaka | 2009 | Maintenance | P SR-2 Column Tray Replacement and
Modification Work. |
PFC Engineering Sdn Bhd | Petronas Penapisan Melaka | 2009 | Major Turnaround | To execute tie in o f o f 810 points during revamp
works . |
Dialog Plant
Services Sdn Bhd | BASF Petronas
Chemicals Sdn Bhd | 2009 | Maintenance | Unload and loading catalyst for Reactor R1311. |
PFC Engineering Sdn Bhd | Petronas Penapisan Melaka | 2009 | Shutdown | Mechanical package works for P SR-2 unit 21, 24,
26,27 and 28.
|
Sankyu (M) Sdn
Bhd | Titan Chemical
Malays ia | 2009 | Maintenance | Dismantle old and re ins tall new tray for Column
R2T-270, 2T-340 & 2T-365 and necessary
additional jo bs . |
P FCE J V
(P FCE Timur)
| Optimal Chemical
Malaysia Sdn. Bhd | 2009 | Major Turnaround | Mechanical and defect works . |